SOE Building Renovation Timeline - Phase 4

Contact: Michael Napolitan, Facilities Manager
Last modified: July 23, 2014

May 1, 2015 -  August 31, 2015

Phase 4 will consist of performing work on the first, second and third floor of the north building. During this phase, offices 1001, 1002, 1036, 1038, 1042, 1046, 1050, 1054, 2001, 2002, 2014, 2018, 2022, 2026, 2030, 2034, 2102, 2108, 2117, 2119, 2014M, 2018M, 2022M, 2026M, 2030M and 2034M and conference room 2114 will have the new chilled beam system and new perimeter heating hot water fin tube installed. Offices 1102, 1108, 1110, 1111, 1123, 1124 and conference room 1034 will have new perimeter heating hot water fin tube installed. Conference room 1211 will have new perimeter heating hot water fin tube installed and will have its existing ductwork connected to AHU-7 for ventilation supply air. Prechter Lab 2202 will have new perimeter heating hot water fin tube installed. Existing AHU-4 in room 1205M will be connected to ductwork from AHU-7 and new perimeter heating hot water fin tube will be installed in classroom 1202 without affecting classes. Ductwork will be demolished in the corridor of the 3rd floor and reinstalled to allow for increased capacity to serve office 3210 from existing AHU-1 on the 4 th floor. No work will take place in offices 3104, 3109, 3111, 3112, 3113, 3115, 3117, 3116, 3118 and 3119, but access to the offices will be prohibited to allow for construction activities. SF-3 in the northwest basement mechanical room will be demolished during phase 4. Approximately 85 occupants will be displaced. Intermittent work in the corridor to connect to the facilities offices east of the stair and elevator will need to be executed in unoccupied hours to allow continued access to the elevator, stair, Brandon Center and Teaching Works.

SOE Building Renovation Phase 1