SOE Building Renovation Timeline - Phase 2

Contact: Michael Napolitan, Facilities Manager
Last modified: July 23, 2014

May 1, 2014 – August 31, 2014

Phase 2 will consist of performing work on the west portion of the south building. During this phase, office suite 1228, 2218 and 2241, Tribute Room 1322 and Community Lounge 1330 will be renovated. Conference rooms 1321 and 2331 and offices 1331 and 2339A-D will be renovated to the new toilet rooms. Classrooms 2224, 2225, 2228 and 2229 and offices 1404, 1405, 1406m 1413, 1416, 1418, 2402M, 2403M, 2404M, 2405M, 2409M, 2410M, 2413M, 2414M, 2601, 2602, 2604, 2608, 2609, 2610, 2612 and 2614 will have the new chilled beam system installed and new perimeter hot water fin tube installed. Classroom 1309, 2302, 2310, 2320, 2328, 2334, 2340 and 2346, conference rooms 1316, 1350 and 2327 and offices 1215, 1217, 1221, 1225, 1227, 1229, 1302, 1323, 1331, 1360, 1400, 1404, 1405, 1406, 1413, 1416, 1418, 2211, 2321, 2232, 2339, 3315, 3316, 3319, 3320, 3321, 3323, 3324, 3325, 3327, 3328, 3329, 3330, 3331, 3332, 3333, 3334, 3335, 3336, 3337, 3338 and 3340 will have new perimeter hot water fin tube installed. Construction access will be required in basement rooms 428, 432, 434, 435, 504, 508, 512, 514, 516, 518, 520, 526, 528, 530 and 534 to allow for pipe routing up to the first and second floors. SF-4 would be demolished during phase 2. The men’s restroom in the southeast corner and the women’s restroom in the southwest corner on floors one and two would be decommissioned and used as mechanical shafts during phase 2. Ductwork will be demolished in the corridor of the 4th floor and reinstalled to allow for increased capacity to serve offices 4214, 4215, 4216, 4218 and 4220 and classroom 4212 from existing AHU-1 on the 4 th floor. No work will take place in offices 4107, 4109, 4111, 4112, 4113, 4114, 4115, 4116, 4117, 4118, 4119, 4120, 4121, 4122, 4124 and 4204, but access to the offices will be prohibited to allow for construction activities. Approximately 165 occupants will be displaced and 14 classrooms would be unavailable during the spring and summer semesters.

SOE Building Renovation Phase 1